The EAGLE drafter for Llama-3.2-3B, split across V80 cards (HEAD and TAIL) with an H200 doing target verification. Pick a milestone to see which hardware it added. Every number is labelled M measured from RTL, a built wrapper or a routed report, D derived, or P projected. Items not checked are marked unverified.
Architecture timeline
Added or changed at this milestoneHEAD cardTAIL cardGPU / host / PCIeCard-to-card link / 4-cardNot yet present
Block details
Select a block in the diagram.
Batch-1 throughput by milestone
Filled dots are measured on silicon, hollow dots are projections. The 4-card SIBX-E point (50.0) ran on a chassis slowed 2–3.5× by an SMI storm, so it is not comparable with the record pair.